Laserfiche WebLink
- 4 - <br />Maps & Exhibits: <br />Submit two (2) complete, unbound copies of the following application exhibits: <br />X6.3.1 EXI-IIBTT A -Legal Description and Location Map <br />6.3.2 E?G-IIBIT B -Site Description <br />/6.3.3 EXI-IIBIT C - Mhring Plan <br />/6.3.4 EXI-IIBTT D - Reclamafion Plan <br />6.3.5 EXI-IIBIT E -Maps <br />6.3.6 EXHIBIT F -List of Other Permits and Licenses Required <br />6.3.7 EXHIBIT G -Source of Legal Right-to-Enter <br />6.3.8 EXHIBIT H -Municipalities Within aTwo-mile Radius <br />6.3.9 EXHIBfp I -Proof of Filing with County Clerk <br />6.3.10 EXHIBIT J -Proof of Mailing Notices of Permit Application <br />6.3.12 EXHIBTT L -Permanent Man-Made Structures <br />1.6.2(1)(b) ADDENDUM 1 -Notice Requirements (sample enclosed) <br />6.5 Geotechnical Stability Exhibit (as required) <br />Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are a number of <br />important requirements which you, as a permittee, should fully understand. These requirements aze listed below. Please read and initial <br />each requirement, in the space provided, [o acknowledge that you understand your obligations. if you do not understand these obligations <br />then please contact this Office for a full explanation. <br />FG 1. Your obligation [o reclaim the site is not limited to the amount of the fmancial warranty. You assume legal liability for <br />all reasonable expenses which the Boazd or the Office may incur to reclaim the affected Lands associated with your mining <br />operation in the event your permit is revoked and fmancial warranty is forfeited; <br />PG 2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a fording that the permittce violated the terms <br />or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the application or your <br />permit misrepresent important material facts; <br />PG 3. Tf your mining and reclamation operations affect azeas beyond the boundaries of an approved peraut boundary, substantial <br />civil penalties, to you as permittee can result; <br />PG 4. Any modification to the approved mining and reclamation plan from those described in your approved application requires <br />you to submit a permit modification and obtain approval from the Boazd or Office, <br />PG 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />PG 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the mine site, <br />which shall be cleazly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land Reclamation <br />Boazd; and, <br />a thepermitnumber. <br />