My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88660
DRMS
>
Back File Migration
>
Revision
>
REV88660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:45 AM
Creation date
11/21/2007 10:44:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
9/19/2001
Doc Name
TR-38 METHANE MONITORING DRILL HOLE BOWIE 1 MINE PN C-81-038 BOWIE RESOURCES LIMITED
From
DMG
To
J E STOVER & ASSOCIATES
Type & Sequence
TR38
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Departmen[ of Na[ural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone. 1303) 866-3567 <br />FA%: (303) 8328106 <br />September 19, 2001 <br />DIVISION OF <br />MINERALS <br />6c <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br /> Bill Owens <br /> Governor <br />Jim Stover, P.E. Greg E. Walcne, <br />J.E. Stover & Associates Execmrve D~reaor <br />2768 Com ass Drive, Suite 101 <br />p Michael R. Long <br />Division Director <br />Grand Junction, Colorado 81506 <br />RE: Technical Revision No. 38, Methane Monitoring Drill Hole, Bowie No. 1 Mine, Permit <br />No. C-81-038, Bowie Resources Limited. <br />Dear Mr. Stover: <br />The Division has finished its review of Bowie Resources Limited's (BRL) submittal of TR-38 <br />and has the following questions or comments: <br />Attached is the Division's reclamation bond estimate for TR-38. The Division's liability <br />estimate is $14,470.00. This is $9,763.00 more than Bowie's estimate of $4,677.00. <br />There are three reasons for this difference in estimates. First, BRL used old equipment <br />costs. Second, BRL does not include costs for topsoil replacement in their estimate. <br />Third, BRL does not include any indirect costs in their estimate. Please let the Division <br />know if this estimate is acceptable. <br />2. Map 8-8 shows a collection ditch at each of the three pads. Please provide designs for <br />these three ditches. <br />Please either explain why the pad that is proposed in TR-38 does not need an upland <br />diversion ditch or provide an appropriate ditch design and a revised pad diagram. <br />4. Please designate, in an appropriate permit text location, which generic design applies to <br />the monitoring hole pad for TR-38. <br />Please provide a proposed well completion diagram for the methane monitoring hole. <br />6. Upon installation, please provide a completion diagram for the methane monitoring hole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.