Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Tusk # ' 004 Slate ' Colc,radu Purm~Ulob # M-1998-052 <br />Datn Oti122/2004 Counly:Sunrrnil Abbreviation : none <br />User ACS Sdo:MasrotPlacor Fllename: M052-004 <br />Agency or organization name :Colorado Drvisra, OI Mmvrals And Geokrgy <br />Permit or other job action :Conversion Applica#ar CN-001 <br />Task aescript~on Reduce "Side' Faces to 3: 1, back drag w/hoe to protect stream <br /> <br /> <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 3IOB L florsepowar 715 <br /> Weight (MT) : 18.36 <br />host Oroak~lswn ; Utilization <br />Ownership cosUhour : Sf9.37 NA Shitt basis : 1 per day <br />Operating costlhour : $2 L71 f00 Data source : (CRG) <br />Operator cosVhour 632.02 NA <br />Total unit cosVhour : 573.11 Total fleet cosUhour f 73.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume 3,ti11 CCY factor 1.060 volume 3,828 LCY <br />Source of estimated volume :6-f4-2004 adequacy response, lace is 10'H x 26U0'L <br />S i'npp7 pt pShnlalvd swell IaftOf : $Wel! /acfo! lef plf mn <br />HOURLY PRODUCTION <br />Excavator Cvcly Time lload bucket. swing loaded,.pump bucket sv~ng om~) <br />Basic job condition doscrlplion ' BELOW AVERAGE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.30 minutes <br />Bucket Capacity <br />Rated twckol capacty 0.92 LCY (heaped) Bucket size class : medium <br />Bucket till lactor : 0.97 Sand and yraval (95% - 100%) <br />Adjusted bucket capacity . 0.90 LCY <br />Job Condition C~grrg~tlon Factors Source <br />Sito altitude : 10,000 feet Altitude adjustment : 0.67 (Caf NB) <br />Job efficiency adjustment : 0.63 ! t shift/dayJ <br />Net job corroctlon : 0 72 multiplier <br />Unadjusted hourly unit production : 160. (i0 LCY/hour <br />Adjusted hourly unit produr:hon 1:1l1 4 f LCY/hour <br />Adjusted hourly flent production 130.41 LCY/hour <br />JOB TIME AND COST <br />Fleet size 1 vxcavator(-) Total job hme 29.35 hours <br />Unit cost : SO 56f per LCY Total job <:ost : 52,146 <br /> <br />