Laserfiche WebLink
~~ ` ~ r <br />since 1989, with one exception. <br />In order to properly evaluate the bedrock monitoring well reduction <br />the following questions need to be answered: <br />a) When were the bedrock wells establish? Completion information <br />needs to be submitted including the date of completion. <br />b) The probable hydrologic consequences section of the approved <br />permit states that "20 feet of shale between the lowest mined <br />seam and the lower sandstone of the Burro Canyon formation <br />will eliminate any effects on the aquifer from the mining <br />operation." Evidence indicates a lowering of the piezometric <br />surface in and adjacent to the permit area. What is the <br />explanation for the drawdown in the Burro Canyon aquifer? <br />c) Does a well permit exist for the beneficial use of <br />groundwater? <br />Please have the operator respond to the above issues in the near <br />future so I can complete my review of TR-06. If you have <br />questions, let me know. <br />