Laserfiche WebLink
<br />The power line/raptor meeting scheduled for September 25, 1979 with the U.S. <br />• Fish and Wildlife Service and the Colorado Division of Wildlife was <br />canceled. A cursory inspection of the site was made by Ronel Finley and <br />a raptor specialist from the U.S. Fish and Wildlife Service by driving Routt <br />County Road #27 that bisects the permit area. They found no problems to <br />justify reconstruction the existing power lines within the permit area. <br />Reference is made herein to a letter (attached) from Ronel Finley to <br />Energy Fuels dated January 8, 1980 in which their evaluation is stated, and <br />which indicates that while further on site inspection is warranted, no <br />problems with power lines as presently constructed are expected. <br />The substation will be relocated to an area adjacent to "Trudy's Corner" <br />to allow the 8050 to reach the dismantling site. In order to construct the <br />pad and access road into the pad approximately 1,000 CY of topsoil will be <br />windrowed into the stockpile adjacent to the site. The location of the <br />windrowed topsoil is shown on Permit Renewal Map 5, Mine Plan, Roads, Power <br />Lines and Facilities. The topsoil will be salvaged to an approximate depth <br />of 32 inches. The stockpile will be stabilized with the topsoil <br />• stabilization mixture. <br />A temporary ditch crossing will be required to pull the substation into the <br />site. The haulroad drainage ditch will be filled in and the substation will <br />then be pulled into the site. After the substation is across the ditch the <br />material will be removed from it and the ditch function will be <br />reestablished. Utility trucks will be able to drive thru the ditch, <br />therefore no culvert will be required after the substation is in place. <br />After the substation is no longer needed it will be removed from the site. <br />A temporary ditch crossing will be required and it will be constructed and <br />removed as per the above details. After the substation is removed the <br />topsoil will be regraded and seeded with the approved seed mixture. <br />u <br />MR 90-51 780-41 Revised 05/21/90 <br />