Laserfiche WebLink
• <br />• <br />• <br />SEDIMENT POND WATER BALANCE <br /> <br /> Receives Capacity Excess Excess <br /> (acre-ft) (acre-ft) (acre-ft) Destination <br />POND #1 <br />Sediment 0.38 0.15 0.23 <br />Runoff 0.63 0.55 0.08 POND #2 <br /> <br /> <br />POND #2 <br />Sediment 0.18 <br />From Pond #1 0.23 0.11 0.30 <br />Runoff 0.33 <br />From Pond #1 0.08 0.40 0.01 POND #3 <br /> <br /> <br />EXPANDED WASTE AREA POND <br />Sediment 0.86 0.75 0.11 <br />Runoff 1.61 0.96 0.65 POND #3 <br /> <br /> <br />POND #3 <br />Sediment - 0.11 <br />From Pond 2 0.30 <br />From Was[e Area Pond 0.11 0.29 <br />Runoff <br />From Pond 2 0.01 <br />From Waste Area Pond 0.65 0.41 0.26 POND #4 <br /> <br /> <br />POND #4 <br />Sediment - <br />From Pond 3 0.29 0. I 1 0.18 <br />Runoff <br />From Pond 3 0.26 0.41 0.00 <br /> <br />Notes: <br />1. Sediment may have to be removed from ponds more often then annually. <br />2. Waste area pond is to be expanded prior to the construction of the east ridge gob pile. <br />5 <br />