Laserfiche WebLink
<br />_ - <br />^ ~ ~ ~~~ ~~~~~~~~~~~~~III STATESOF COLORADO <br />MINED LAND RECLAMATION DIVISION of ~~<a <br />Department of Natural Resources N~%qr$ <br />1313 Sherman St., Room 215 , ~ o r'~ ~ <br />Denver, CO 60203 ~q~.+7, <br />303 666-3567 ~•,, 6• <br />FAX: 303 8328106 <br />Roy Romer, <br />Governor <br />Fred R. Banta. <br />Division Dnector <br />January 29, 1992 <br />James A. Kiger <br />Senior Environmental Specialist <br />Colowyo Coal Company <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />RE: Colowyo Mine, Permit C-81-019 <br />PR-O1; Excess Spoil Fills: Response to Geotechnical Adequacy <br />Dear Mr. Kiger: <br />The Division has completed its review of Colowyo's revised <br />submittal of Exhibit 19: West Pit Excess Spoil Fill. The <br />Division's comments are as follows: <br />1. In the "Reclamation Plan" section of Exhibit 19, a reference <br />is made to an "attached Map" that would show details of the <br />construction of the fill. We are unable to find such a map <br />Please submit a map detailing construction of the fills, <br />certified according to the standards of Rule 2.10. <br />2. Colowyo has satisfied all of the underdrain design <br />requirements of Rule 4.09.2 except subsections (2)(c) and <br />(3)(c) which require the design and construction of a filter <br />system to protect the underdrain from contamination. <br />Colowyo has not given sufficient evidence to support its <br />contention that gravity segregation of spoil will result in <br />the creation of an acceptable filter system. Colowyo will <br />have to amend its application to include designs for the <br />construction of a filter system to protect the underdrains <br />(Other operators have used a variety of techniques to protect <br />underdrains, from graded materials to geotextile fabric). <br />3. In the "Inspection Plan" section of Exhibit 19, Statement 1, <br />a reference is made to the possibility of non-bedrock <br />conditions at the toe of the Section 16 Fill. <br />Colowyo will need to amend this statement to read: "any <br />amended design will be submitted to the Division for its <br />review and approval, prior to construction of the fill". <br />