Laserfiche WebLink
<br /> <br />Adequacy Review - MR100 Page 2 <br />September 7, 1993 <br />and she stated that this design will be submitted. <br />4. MCC apparently would like to use material from the embankment <br />of MB-2 down to the emergency spillway for construction of the <br />temporary dike in MB-2. The pond embankment must meet Rule <br />4.05.6 - Sedimentation Ponds, particularly 4.05.6(4) and <br />4.05.6(11). The Division will need some plans, in writing, <br />describing how much material will be removed (specify <br />elevations) and that the embankment will comply with the <br />regulations. <br />The Division has discussed these concerns over the telephone with <br />John Poulos of Mountain Coal Company today, September 7, 1993. In <br />addition, these concerns were faxed today to Mr. Poulos. <br />CEJ/007MR100.0907 <br />