Laserfiche WebLink
r.- <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FAX: 13031 832-8106 <br />STATE OF COLORADO <br />'~CF <br />ffb 23 <br />MINING PERMIT - COAL <br />TECHNICAL REVISION DECISION FORM <br /> <br />Ray Romer <br />The Division of Minerals and Geology, Department of Natural Resources, cover^or <br />State of Colorado has proposed the decision stated below. The decision lames S. Lochhead <br />will become effective upon the termination of the ten (10) day public Eaecuuve Direuo. <br />comment period, pursuant to Rule 2.08.4(5>(b)(ii). Mirnae'B.E°a, <br />Drvmon Director <br />Permit No.: C-80-007 Technical Revision No.: 75 <br />Submittal Date: January 17, 1995 Decision Date: February 8, 1995 <br />Revision Decision Type: Approved with Conditions <br />Minel: West Elk Mine <br />Permittee: Mountain Coal Company <br />Description of Revision: Add 3400 cy of Coal to Lone Pine Pile <br />Change in Bond Amount: No Change <br />Area Changes <br />Disturbed Area (+/-) .0 Ac. Max. Disturbed Area (+/-) .0 Ac. <br />Affected Area (+/-) .0 Ac. Permit Area (+/-) .0 Ac. <br />Federal Land (+/-) .0 Ac. State Land (+/-) .0 Ac. Private Land (+/-) .0 Ac. <br />Revised Application Pages None Revised Maps None <br />Revised Exhibits 42A <br />PERMITTEE2 DIVISION OF MINER - D GEOLOGY <br />n COLORADO DEPA NATURAL RESOURCES <br />X ~«~~/ <br />Authorized Representative Author presentative <br />DATE: ,2/it~g~ DATE: z~ls/sr <br />Stipulations Attached Yes XX No _ <br />lIf this action pertains to a federal mine (coal or surface ownership) the <br />permittee must submit documentation that the application, including any <br />modifications resulting from the review, was sent to the agencies listed on <br />the Federal Agency Mailing List. For non-Federal mines 1 copy of the revision <br />must be sent certified mail to OSM at Suite 1200, 505 Marquette Avenue NW, <br />Albuquerque, New Mexico 87102. The project may not proceed until all copies <br />have been sent. <br />2Signature is required if stipulations are attached. <br />0688G <br />