Laserfiche WebLink
Exhibit D Reclamation Plan <br />Reclamation plan details will not change from the original reclamation plan submitted to <br />the Division. All salvageable topsoil will be stockpiled and re-distributed over the final <br />graded azea at the end of mining operations. Topsoil will be redistributed over the site at <br />a depth of 6'-12" depending on the amount available for use. Seed mixtures and fertilizer <br />rates as noted by the Canon City NRCS office in the original reclamation plan will be <br />followed. <br />