Laserfiche WebLink
• <br />RECLAMATION COST SVMMARY con['d shee[ 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCIION <br />Task No.~ Task Description ~ Cost IS) <br />________I__________________________________________________I____________ <br />________I__________________________________________________I ____________ <br />Subtotal IN1: <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ CosC I51 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />___I--__ <br />Subtotal II1: <br />J. EARTHWORK - 70PSOIL/SUBSOIL REPLACEMENT <br />Task No.~ iask Description <br />________I____________________________________ <br />~ Haul and spread topsoil <br />(from applicant's estimate) <br />Cos[ I51 <br />$"!~, 409 <br /> <br />