Laserfiche WebLink
Fram: Jim Stover To: <br />i , <br />MINE ENGINEERING <br />MINE RECLAMATION <br />Via Facsimile Transmittal <br />September 16, 1999 <br />Larry Routten <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Powderhorn Coal Company <br />Revision Order - OSM/DMG Inspection <br />Permit C-81-041 <br />Dear Mr. Routten: <br />III I II I II I II Iill III Page 1 0( 1 <br />999 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DMG's letter dated August 31, 1999 was an order to revise portions of Powderhorn Coal <br />Company's (PCC) permit as a result of the OSM/DMG special focus "land disturbance" <br />inspection. Approximately 35 maps are currently being revised to correct the permit and <br />surface disturbance boundaries. Due to the time necessary to correct the maps and make <br />the appropriate number of prints, please extend the deadline for the response to the revision <br />order from Friday September 171h to Wednesday September 22, 1999. <br />Please let me know if you have any questions. <br />Sincerely, <br />Dale: 9/16/99 Time: 10:04:12 AM <br />J. E. STOVER 8~ ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-0101, FAX 242-7908 <br />J. E. Stover, P.E. <br />Consulting Engineer <br />