Laserfiche WebLink
<br />Menzer Quarry -Bond Estimation <br />Seeding: <br />Cost ofseed = <br />Pounds per acre = <br />Total pounds needed = <br />CostoTSeed = <br />Seeding cost per acre= <br />Seeding cost = <br />Total seeding cost = <br /> <br />$4.00 per pound <br />18.5 pounds <br />919.45 pounds <br />$3,677.80 <br />$75.00 <br />$3,727.50 <br />$7,405.30 <br />Bench Backfill Costs = $62,330.56 <br />Bench Topsoiling = $36,956.60 <br />Bench Seeding = $3,837.71 <br />Tree Planting = $1,800.00 <br />Bench Wall Staining = $22,590.00 <br />Floor Ripping = $7,952.00 <br />Floor Topsoiling = $36,082.20 <br />Floor Seeding = $7,405.30 <br />DIRECT COST TOTAL = $180,954.36 <br />DMG & Contractor Indirect Costs <br />Percent Indirect = 18.00°i <br />Indirect Costs = $32,571.78 <br />file name: BND MD4 <br /> <br />L COST FOR THIS MODEL = $213,526.15 <br />