Laserfiche WebLink
<br />Menzer Quarry -Bond Estimation <br />Seeding: <br />Cost of seed = <br />Pounds per acre = <br />Total pounds needed = <br />Cost of seed = <br />Seeding cost per acre= <br />Seeding cost = <br />Total seeding cost = <br /> <br />$4.00 per pound <br />18.5 pounds <br />919.45 pounds <br />$3,677.80 <br />$75.00 <br />$3,727.50 <br />$7,405.30 <br />Bench Backfill Costs = $24,755.56 <br />Bench Topsoiling = $15,472.22 <br />Bench Seeding = $1,524.21 <br />Tree Planting = $1,800.00 <br />Bench Wall Staining = $22,590.00 <br />Floor Ripping = $7,952.00 <br />Floor Topsoiling = $36,082.20 <br />Floor Seeding = $7,405.30 <br />DIRECT COST TOTAL = $117,581.48 <br />DMG 8 Contractor Indirect Costs <br />Percent Indirect = 18.00 <br />Indirect Costs = $21,164.67 <br />file name: BND MD3.WO1 <br />RECL COST FOR THIS MODEL = $138,746.15 <br />