Laserfiche WebLink
PAGE TWO <br />FEBRUARY 20, 1996 <br />DAN MATHEWS <br />Reclamation: Once we no longer ship Colowyo coal, which we expect not to exceed six months, the <br />area will be reclaimed. The gravel and road base material will be removed. The site will be ripped, <br />graded, spread with topsoil removed from the area and revegetated as per the permit requirement. <br />We expect to accomplish this task in the fall of 1996. <br />Sincerely, <br />~~~ ~~ <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />cc: Raja Upadhyay <br />Jeff Dubbert <br />Larry Routten <br />