My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88209
DRMS
>
Back File Migration
>
Revision
>
REV88209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:25 AM
Creation date
11/21/2007 10:40:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
10/7/1993
Doc Name
FAX COVER MINREC INC BOND RELEASE INSPECTION NORTH THOMPSON CREEK MINE PN C-81-025
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10-07-1993 11~45RM FROM J. E. STOUEP. 8 RSSOCIRTES TO 15057662609 P.02 <br />~-- . <br />Page 225 <br />Section 3.05.6 <br />(d1 Proceeds of forfeited bands shall be deposited <br />by the Division in a separate reclamation account available to <br />the Division. Said proceeds shall be used by the Division for <br />reclamation of the area covered by the bmd. Said reclamation <br />shall include all costs and administrative expenses associated <br />with the condJCt of the applicable reclalmtion activities <br />required by 4.21, Forfeited amounts received by the Ofvision in <br />excess of such costs and expenses shall be refunded to Ltie <br />person resp~nsi6le ar to the surety. whid~ever is appropriate. <br />(4) Determination of the forfeiture amount. <br />The Board shall either: <br />(a) Determine the amount of the bond to be <br />forfeited on the basis of the estimated cost to the Oiviston or <br />its contractor to camel ete the reclamation and other regilatary <br />requirements in accordance with these Rules; or <br />(b) Declare forfeited the entire amount of the <br />bend for which liability 15 outstanding. <br />3.06 SPECIAL BONDING REWIREIIENTS fOR CONSTRUCTION OF MUTE <br />DRAINAGE CONTROL FACILITIES <br />3,06.1 Bond Requirements. <br />Performance bond iiability shall include construction of <br />lmpounanents, conveying systems, and treatment facilities for <br />mine drainage planned in accordance with 4.05.2. 4.05.8, and <br />4.05.10. Bond liability with respect to mine drainage shall <br />extend to the construction and ultimate removal of facilities <br />described in the permit application or recamation plan as <br />associated with the treatment of mine drainage. The bond amount <br />determination made under 3.02,2 shall not include continuous <br />treatment, mmitaring, or potential unp-edictable expenses <br />resulting from mine drainage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.