My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88206
DRMS
>
Back File Migration
>
Revision
>
REV88206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:25 AM
Creation date
11/21/2007 10:40:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
1/6/1997
Doc Name
COAL RIDGE 1 MINE PN C-84-065 TR APPLICATION 13
From
DMG
To
GLEWOOD POST
Type & Sequence
TR13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE OF PROPOSED DECISION <br />The Colorado Division of Minerals and Geology proposes to approve with conditions Technical <br />Revision Application No. 13 for the Coal Ridge No. 1 Mine (Permit No. C-84-065), submitted by <br />NCIG Financial, Inc.. <br />The Coal Ridge No. 1 Mine is an underground coal mine located in Garfield County, approximately <br />1.5 miles east of Newcastle, Colorado. Coal interest is private, and the surface affected is private <br />land. The permit area encompasses approximately 2,520.6 acres. <br />This proposed decision is based on a finding that the proposed operation will comply with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, Section 34-33-101, et seq., <br />C.R.S., and the regulations promulgated thereunder. <br />Copies of the proposed decision, including stipulations, are on file for public inspection at the <br />Colorado Division of Minerals and Geology, Room 215, Centennial Building, 1313 Sherman Street, <br />Denver, Colorado 80203, and at the County Clerk's Office in Garfield County, 109 8th St Ste 200, <br />Glenwood Springs, 81601. Persons with an interest that may be adversely affected by the proposed <br />decision may request a formal hearing before the Mined Land Reclamation Board on the proposed <br />decision. Such request must be made within ten (10) days of the initial publication of this notice, must <br />be in writing, and must state with reasonable specificity the reasons for the request and the objections <br />to the proposed decision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.