Laserfiche WebLink
Proposed <br />Increase/Decrease Required <br />Liabilit <br />SCC Bond Held <br />Excess Bond Held <br />TR-25 $580,530 $5,128,121 $5,200,000.00 $71,879.00 <br />PR-02 -$209,898 $4,918,233 $5,200,000.00 $281,767.00 <br />TR-29 $128,416 $5,046,639 $5,200,000.00 $153,361.00 <br />SL-01 -$11,862 55,034,777 <br />This concludes the portions of the findings document you have asked me to write. The <br />Division is reducing the bond to the liability required then doing a bond release based on <br />the applicable amount following the reduction. If anything is not clear or if you would <br />like more detail or any clazification, please let me know. I will a-mail this memo to you <br />so you can cut and paste as you desire. <br />cc: Sandy Brown w/out attachments <br />