Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1 J 13 Shermar. G., Room 215 <br />Dem'cr. CG Hp203 <br />Phune' ~ 1031 HG6~156? <br />FAX: i',OT 832~810G <br />February 19, 1993 <br />Mr. Basil Bear <br />Bear Coal Company, Inc. <br />P.O. Box 518 <br />Somerset, CO 81434 <br />Re: Bear Mine (Permit No. C-81-033) <br />Technical Revision No. 11 (Reclamation Bond Calculations) <br />Dear Mr. Bear: <br />pF' e0~ <br />~~'"~ ~o <br />.~r° G. <br />+as+~ <br />~ /B l6 ~ <br />Rov Romer <br />Governor <br />nn ichael B. Lons <br />Div is ian Director <br />We have received your technical revision application to revise your permit (File <br />No. C-81-033) to conduct coal mining in Colorado. Our initial review indicates <br />that all preliminary items required by the Colorado Surface Coal Mining <br />Reclamation Act, C.R.S. 34-33-101 et sew., have been submitted; thus your <br />technical revision application has been deemed complete for the purposes of filing <br />on the above date. All review and comment periods as provided in the Act and <br />Regulations promulgated thereunder initiate from this date of filing. <br />A copy of the technical revision application, less any confidential information, <br />must be filed for public inspection with the Delta County Planner or Clerk and <br />Recorder. Any subsequent changes or additions must also be made in this copy. <br />The proposed newspaper advertisement submitted with the application has been found <br />to be satisfactory. You should commence publication of this advertisement as <br />specified in Rule 2.07.3.(2) of the Regulations with the exception that the <br />publication need only be run once, and reference to the informal conference <br />specified in Rule 2.07.3(2)(d) should be deleted. Proof of the publication of the <br />advertisement must be filed with the Division as soon as available after the <br />publication date. <br />The staff is currently reviewing your technical revision application to determine <br />whether the items you have submitted are adequate in terms of meeting the <br />requirements for purposes of adequacy. You will be notified as to the Division's <br />findings of adequacy or inadequacy of your revision application. The Division <br />will render a proposed decision on or before April 20, 1993. <br />If you have any questions, please contact me <br />Sinceince e <br />Steve S. Shuey <br />Reclamation Special st <br />SSS/bjw/2323G <br />