My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-03-24_REVISION - M1977493 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2004-03-24_REVISION - M1977493 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:14 PM
Creation date
11/21/2007 10:39:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
3/24/2004
Doc Name
Final Stamped Design and Construction Info for Rons Riser
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Mr. Ronald J. Valentine, PE <br />Climax Molybdenum Company <br />February 17, 2004 <br />Page 3 <br />^ intake structure was then encased in concrete and a level platform for the building established. A <br />fiberglass, reinforced, cast-in-place, concrete structure was constructed above the intake structure. <br />The structure incorporated fiberglass reinforcement and used sulfate resistant concrete. A HDPE <br />baffle was installed around the intake and the gate, gate operator, and fiberglass stop logs installed. <br />A perimeter rail was also installed around the building deck. <br />FIELD TESTING AND OBSERVATION <br />' Construction management and oversight was performed in house by Climax. Verification of <br />reinforcing bar installation, spacing and overlap, and the general structure dimensions were also <br />completed by Climax. Independent third-party firms were contracted to perform QA/QC testing of <br />critical materials. URS was contracted to collect samples and performing strength testing of the <br />grout and structural concrete. Visual inspection and dye penetration testing of the stainless steel <br />casing welds performed by AMEC Consultants. <br />On January 15, 2004, a representative from URS Corporation, Mr. Christopher Hatton visited the <br />Climax mine and observed the completed decant structure. During our visit, we reviewed project <br />files and the results of independent third-party QAlQC testing described above. The decant <br />operation and critical features such as the inlet weir horizontal plumbness was also observed. At the <br />~ time of our visit, the structure was functioning as designed. <br />Based on our observation and review of QA/QC and other construction documents, the construction <br />was completed in general accordance with the design drawings and approved specification. It is also <br />anticipated that the as-constructed decant structure will meet or exceed the design flow capacities. <br />If you have any questions or comments, please do not hesitate to call. <br />Attachments <br />cc: File <br />N:WENERALUDMIMDNH~RDMIMCLIMR%-DECENT SUMMMY iiPT_HEVI.DOC p2q/W~1a0 PM) <br />
The URL can be used to link to this page
Your browser does not support the video tag.