Laserfiche WebLink
' 182 <br /> 1 bottom width. <br /> 2 And those have riprap approximately <br /> 3 inch and a half in size, so . <br /> 4 A And I appreciate that, and to be very <br /> 5 honest, I missed that part of it. But what happens <br /> 6 if we have a storm that's greater, that rips out <br />' <br /> 7 that trickle channel. Then you <br />ve got the problem <br />' 8 compounded, because then you've got a structure that <br /> 9 probably can cause a lot of agitation of water that, <br />t l0 in turn, would increase the erosion action. <br /> 11 So those are structures that are fine if <br />1 12 th <br />d <br /> ey are <br />one properly and installed in a mariner <br />' 13 that can be assured, and if the MLRB can be assured <br /> 14 they will stay in place, that's great. <br /> 15 But I kind of have my doubts the}~ will <br /> 16 stay in place that long if you get, let's sa}, a <br />' 17 10-year event. <br />18 Q Okay. I might mention that they also <br />19 will pass the probable maximum flood event. You <br />' 20 mentioned also a question as far as who would. <br />21 monitor the success of the vegetation and that it <br />' 22 takes about two growing seasons and that you hope <br />23 the SCS would probably engage in that. <br />24 I might just mention that it is the <br />25 Mined Land Reclamation Division that will do the <br />' AGREN, BLANDO & BILLINGS <br /> <br />