Laserfiche WebLink
' 180 <br /> <br />' 1 watershed we are dealing with? Can you tell me what <br /> 2 the soil types are there that we are talking about? <br /> 3 I don't know. You are asking a question <br /> 4 without having a lot of information on this end. <br />' S Q Okay. Essentially, they are the same <br /> 6 size as the waste rock piles as they are designed as <br />1 <br /> 7 a collection ditch below them. <br />' 8 You mentioned that, as an expert on <br /> 9 erosion, that the ditches will erode. I wor.~dered if <br />' 10 you can offer any suggestions as to what measures <br /> 11 you would recommend to prevent those ditches from <br />' 12 erodin <br /> g. <br />' 13 A One of the measures that I will admit is <br /> 14 in here is using check structures, as they Y.~ave <br /> 15 identified. Another measure possibly could be, is <br /> 16 to line those ditches where the velocities are <br /> 17 extremely high, and they could slow it down that <br />' 18 way. <br /> 19 A third measure, which is one tY.at I <br /> 20 would encourage, that would sort of combine not only <br /> 21 lining of those ditches, but is to try their <br />' 22 darnedest to make sure they get vegetation going <br /> 23 along those ditches to help slow that down, also. <br />1 <br /> 24 Q I might just mention in our -- okay -- <br /> 25 the operator has committed to seeding of the <br />' AGREN, BLANDO & BILLINGS <br /> <br />