Laserfiche WebLink
i <br />` , 262 <br /> 1 d <br /> an a <br />equate reclamation job. <br />' 2 MS. JACQUEZ: There was a referer.~ce -- <br /> 3 I'm still not clear and I don't know who to address <br /> 4 this to -- but I am still not clear on this fence <br /> 5 issue. <br />' 6 My understanding is that the cyanide <br /> 7 storage area will have an 8-foot fence; isn't that <br />' 8 i <br />ht? <br /> g <br />r <br />' 9 Then there was an additional commitment <br /> l0 from Battle Mountain Gold. Could we have a c_.ear <br /> 11 presentation on the fencing? <br /> 12 MS. BALDRIGE: Certainly, I can give <br /> 13 that to you. We have addressed three areas of <br /> 14 fencing today. We have addressed fencing during the <br />' 15 ti <br />t th <br />t <br />t <br />ili <br />f <br />ilit <br />Th <br /> opera <br />ons a <br />e curren <br />e <br />a <br />ngs <br />ac <br />y. <br />' 16 commitment in the amendment is to fence the <br /> 17 collection pond at the tailings facility during <br /> 18 operations with a 7-foot high fence. <br /> 19 The tailings facility itself, during <br /> 20 operations, will be fenced with a four-strand barbed <br /> 21 wire fence. Also, during operations, the mill <br />' 22 f <br />iliti <br />l <br />i <br /> ac <br />es area w <br />l <br />have fencing. <br /> 23 The fencing that we addressed was the <br /> 24 cyanide storage area at the mill facilities, which <br />' 25 will be an a-foot chain-link fence with a locked <br />' AGREN, BLANDO & BILLINGS <br /> <br />