Laserfiche WebLink
i <br />Fichard D. Lamm <br />Governor <br />DEPARTMENT OF' NATURAL RESOURCES <br />David H. Gelches, Executive Director <br />MINED LAND RECLAMATION DI1 <br />DAVID C. SHELTON, Director <br />REGULAR (112) OPERATION <br />APPLICATION PACKAGE <br />AQplicability <br />This package applies to a mining operation which affects more than 10 acres <br />and extracts more than 70,000 tons of mineral and/or overburden per calendar <br />year. If you p an to conduct a mining operation which satisfies these <br />criteria, then you should follow the instructions provided in this package for <br />filing an application. <br />Filing Requirements <br />You should obtain the Mineral Rules and Regulations from the Division <br />(E2.00/copy) and read Rules 2 and 6. To apply for a Mining and Reclamation <br />Permit fora regular operation, five copies of the "Regular Operation (112) <br />Application Form" and Exhit~its A-P and an application fee must be submitted to <br />the Division. Thiss packagE~ contains the application form and instructions for <br />preparing information for attachment as Exhibits A-P. <br />Application Review Procedures <br />Upon receipt of the application form, exhibits and application fee, the <br />Division will review them and notify you within 10 days whether they contain <br />the minimum information required by the Mined Land Reclamation Act and Rule <br />of the Mineral Rules and Regulations. If the application contains this <br />information, then it will be considered "complete", and you will be notified <br />to proceed with the notification requirements of Rule 2. If the application <br />does not contain the minimwn information, then you will be notified of the <br />information required to mak~a it "complete". <br />Your application will be scheduled for consideration by the Mined Land <br />Reclamation Board within 90 days after it is deemed "complete". You will be <br />notified of the date when the Board will consider your application. The Board <br />will decide whether all of t:he applicable information and notice requirements <br />of the Act and Regulations leave been satisfied and whether the criteria in <br />Sections 115 and 120 of the Act apply. You will-Te notified of the Board's <br />decision concerning the application. <br />Please note, additional information may need to be added to the application <br />after a "complete" determination in order to satisfy the applicable <br />requirements of the Mined Land Reclamation Act and the Mineral Rules and <br />Regulations. The Division will notify you of any additional information <br />requirements within the 90 day processing time period. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />