UNEXPECTED NO 2
<br />MS 18513
<br />22 k 14 PRINTED ON NO. IODOM CLEAPPRINT
<br />4
<br />UNEXPECTED NO 1
<br />MS 18513
<br />INCAS NO 3
<br />MS18513
<br />ADJOINING USES, WILDLIFE HABITAT
<br />1t BUILDING SIZE AND SQUARE FEET
<br />INCAS NO 2
<br />M518513 PLANT -- - - - - -- 60' X 80' 4,800 SQ FT
<br />LAB ----- - - - - -- 20' X 30' 600 SQ FT
<br />SHOP ---- - - - - -- 30' X 40' 1,200 SQ FT
<br />BUILDING SITE TO HAVE WOOD AND STEEL
<br />PORTIONS REMOVED AND TRANSFERRED OFFSITE,
<br />CONCRETE WALLS TO BE PUSHED IN ON
<br />CONCRETE FLOORS, WASTE ROCK ADDED TO
<br />CONFORM TO TERRAIN CONTOURS, AREA TO BE
<br />GRADED, RIPPED, SOIL APPLIED, MULCHED, AND SEEDED
<br />10,920'
<br />TOTAL 6,800 SQ FT
<br />INCAS
<br />MS 17117
<br />OUTDOOR PRIVY LOCATION
<br />TREES, ASPEN AND PINE
<br />SHOP AND EQUIPMENT STORAGE
<br />30' X 40', BUILD IN 1997
<br />PROCESSING PLANT - 60'X 80' ASSAY LAB - 20' X 30' `
<br />1995 BUILD 25% OF PLANT BUILD IN 1997
<br />1996 BUILD 75% OF PLANT
<br />PLANT SITE
<br />DRAINAGE FROM BUILDINGS
<br />IS NATURAL FLOW OVER
<br />AND INTO ROUGH, POROUS,
<br />AND SLOPING TERRAIN
<br />TREES, ASPEN AND PINE
<br />i NOV
<br />J RE ?tQ�ox v O LAPSES
<br />A t
<br />010 \01O VV
<br />1OOV SMSP
<br />P�C`pll� TYPICAL CUT AND FILL SURFACE
<br />MINING OPEN CUTS - START 1995
<br />AREA OF MINING - EITHER SURU�
<br />-►�" CUT AND FILL OR UNDERGROUND MINING
<br />SURFACE OPEN CUT AND FILL AND
<br />UNDERGROUND MINING AREA TO HAVE F TEMPORARY
<br />O
<br />ON
<br />RECLAMATION PHASED WITH LOCATION N O PLANT, 2 TON
<br />SIMULTANEOUS OPEN CUT MINING FIR DAY PILOT PLANT. 1995.1
<br />AREA TO BE FILLED, GRADED, RIPPED, L' 1E11APORARY BUILDINGS
<br />SOIL APPLIED, MULCHED AND SEEDED (r 8' X ! 2' SIZE \ \
<br />Irk \
<br />POiTABLE CRUSHING PLANT
<br />,19)5,70'X20'
<br />MINING
<br />AREA
<br />1995
<br />gy960
<br />p,
<br />'t-oats
<br />ADJOINING USES, WILDLIFE HABITAT
<br />ROAD TO BE GRADED INTO TERRAIN
<br />CONTOURS, RIPPED, SOIL APPLIED,
<br />MULCHED AND SEEDED
<br />ADITS TO BE BACKFILLED WITH
<br />WASTE ROCK AND RECLAMIED TO
<br />SURROUNDING TERRAIN CONTOUF
<br />ADITS TO BE OPENED
<br />MINING - MINING
<br />AREA AREA
<br />1996 1997
<br />-'" / `�"
<br />TREES, ASPEN AND PINE \
<br />10,800'
<br />JEEP TRAIL
<br />I
<br />ALL OLD DUMPS WILL BE REMOVED DURILG
<br />MINING PROCESS AND WILL EITHER BE !\/
<br />PP, PROCESSED OR USED AS FILL IN
<br />CONTOUR DEPRESSION 1995 -1997
<br />ADJOINING USES, WILDLIFE HABITAT
<br />PERMIT AREA - 9.94 ACFES
<br />ADITS TO BE OPENED
<br />INCAS NO 1
<br />MS 18511
<br />OPEN CUT AREA TO BE FILLED AND
<br />RECLAIMED�DURING MINING AND
<br />RECLAMATION SIMULTANEOUS PHASES
<br />CUT AND FILL
<br />TAILINGS
<br />DISPOSAL
<br />1998
<br />1`
<br />ROAD TO BE CONSTRUCTED
<br />FOR BUIDINGS ACCESS - 1995
<br />i
<br />/ \\ SOILS STOCKPILE
<br />AREA - 1995
<br />1
<br />ADITS TO BE BACKFILLED WITH
<br />WASTE ROCK AND RECLAMIED TO
<br />MINING SURROUNDING TERRAIN CONTOURS y
<br />AREA
<br />1998
<br />DITS TO BEE OPENED\)
<br />riNOHLL
<br />DISPOSAL
<br />1995 f/
<br />�.
<br />\ \_ JEEP ACCESS ROAD TO BE--UT P
<br />BACK INTO HISTORIC CONDITION
<br />CONTOUR DEPRESSION
<br />1 FILL AND RECLAMATION
<br />AREA, 2004
<br />CONTOUR DEPRESSION
<br />FILL AND RECLAMATION 1 -
<br />AREA, 2002 & 2003 SOILS STOCKPILE
<br />ADITS TO BE BACKFILLED WITH , / AREA - 2002,& 2003
<br />WASTE ROCK AND RECLAMIED
<br />SURROUNDING TERRAIN CONTOURS
<br />SOILS STOCKPILE
<br />_ AREA - 2000 & 2001
<br />CONTOUR DEPRESSION
<br />FILL AND RECLAMATION
<br />AREA, 2000 & 2001
<br />SOILS STOCKPILE
<br />AREA - 1998 & 1999 /
<br />CONTOUR DEPRESSION
<br />FILL AND RECLAMATION
<br />AREA, 1998 & 1999
<br />SOILS STOCKPILE
<br />11 �p0 r
<br />/ p51
<br />1\ ,
<br />SURFACE OPEN CUT AND FILL AND _-
<br />UNDERGROUND MINING AREA TO HAVE OHWILER RIDGE
<br />RECLAMATION PHASED WITH
<br />SIMULTANEOUS OPEN CUT MINING
<br />AREA TO BE FILLED, GRADED, RIPPED,
<br />SOIL APPLIED, MULCHED AND SEEDED
<br />TREES, ASPEN AND PINE
<br />CUT AND FILL \\`
<br />TAILINGS A
<br />DISPOSAL SOILS STOCKPILES WILL BE REMOVED AND
<br />1997 APPLIED TO MINE RECLAMATION AREAS AND
<br />THEN THE SOILS STOCKPILE AREA WILL BE
<br />GRADED, RIPPED, MULCHED, AND SEEDED - -
<br />JEEP TRAIL
<br />CUT AND FILL /
<br />TAILINGS J
<br />DISPOSAL
<br />1996
<br />---/- r// ) M)
<br />TYPICAL CUT AND FILL SURFACE
<br />MINING OPEN CUTS FOR TAILINGS
<br />DISPOSAL - START 1996
<br />AREA - 1996 & 1997 SOILS STOCKPILES WILL BE REMOVED AND
<br />_ APPLIED TO MINE RECLAMATION AREAS AND
<br />ROAD TO BE GRADED INTO TERRAIN THEN THE SOILS STOCKPILE AREA WILL BE
<br />CONTOURS, RIPPED, SOIL APPLIED, GRADED, RIPPED, MULCHED, AND SEEDED '
<br />"'•""' MULCHED AND SEEDED
<br />CONTOUR DEPRESSION
<br />FILL AND RECLAMATION SOILS STOCKPILE I
<br />AREA, 1996 & 1997 AREA - 1995 30
<br />10,60L, CONTOUR DEPRESSION
<br />FILL AND RECLAMATION /
<br />.... �. �,.- �..,... .._w.T.,..--- ^^^"'...��......- .,_ _ \ AREA. 1995
<br />^""'•"•� �-rl -^ �� • �� BLM GPS SURVEY MARKER
<br />CONTOUR RECLAMATION AREA, EACH '-1 / \ / /
<br />PHASE TO BE FILLED WITH WASTE
<br />ROCK, TAILINGS, GRADED, RIPPED \
<br />SOIL APPLIED`, MULCHED, AND SEEDED
<br />JEEP
<br />EASEMENTS - NONE
<br />UTILITIES - NONE
<br />CULVERTS - NONE
<br />ALL STRUCTURES ARE PROPOSED
<br />NORTH
<br />OPEN PIT MINING AREA, 1986
<br />BY NORTHERN MINERALS, INC.
<br />f
<br />ADJOINING USES, WILDLIFE HABITAT
<br />ROAD TO BE GRADED INTO TERRAIN
<br />CONTOURS, RIPPED, SOIL APPLIED,
<br />MULCHED AND SEEDED .�
<br />EXHIBIT E Rece!vPri
<br />RECLAMATION PLAN SEP 3 0 w"i
<br />REVISED 9/4/1994
<br />Durango Kiehl CJ;fs'cA
<br />m
<br />SOILS,STOCKPILE
<br />AREA 2004
<br />� IN I
<br />ik
<br />11 �p0 r
<br />/ p51
<br />1\ ,
<br />SURFACE OPEN CUT AND FILL AND _-
<br />UNDERGROUND MINING AREA TO HAVE OHWILER RIDGE
<br />RECLAMATION PHASED WITH
<br />SIMULTANEOUS OPEN CUT MINING
<br />AREA TO BE FILLED, GRADED, RIPPED,
<br />SOIL APPLIED, MULCHED AND SEEDED
<br />TREES, ASPEN AND PINE
<br />CUT AND FILL \\`
<br />TAILINGS A
<br />DISPOSAL SOILS STOCKPILES WILL BE REMOVED AND
<br />1997 APPLIED TO MINE RECLAMATION AREAS AND
<br />THEN THE SOILS STOCKPILE AREA WILL BE
<br />GRADED, RIPPED, MULCHED, AND SEEDED - -
<br />JEEP TRAIL
<br />CUT AND FILL /
<br />TAILINGS J
<br />DISPOSAL
<br />1996
<br />---/- r// ) M)
<br />TYPICAL CUT AND FILL SURFACE
<br />MINING OPEN CUTS FOR TAILINGS
<br />DISPOSAL - START 1996
<br />AREA - 1996 & 1997 SOILS STOCKPILES WILL BE REMOVED AND
<br />_ APPLIED TO MINE RECLAMATION AREAS AND
<br />ROAD TO BE GRADED INTO TERRAIN THEN THE SOILS STOCKPILE AREA WILL BE
<br />CONTOURS, RIPPED, SOIL APPLIED, GRADED, RIPPED, MULCHED, AND SEEDED '
<br />"'•""' MULCHED AND SEEDED
<br />CONTOUR DEPRESSION
<br />FILL AND RECLAMATION SOILS STOCKPILE I
<br />AREA, 1996 & 1997 AREA - 1995 30
<br />10,60L, CONTOUR DEPRESSION
<br />FILL AND RECLAMATION /
<br />.... �. �,.- �..,... .._w.T.,..--- ^^^"'...��......- .,_ _ \ AREA. 1995
<br />^""'•"•� �-rl -^ �� • �� BLM GPS SURVEY MARKER
<br />CONTOUR RECLAMATION AREA, EACH '-1 / \ / /
<br />PHASE TO BE FILLED WITH WASTE
<br />ROCK, TAILINGS, GRADED, RIPPED \
<br />SOIL APPLIED`, MULCHED, AND SEEDED
<br />JEEP
<br />EASEMENTS - NONE
<br />UTILITIES - NONE
<br />CULVERTS - NONE
<br />ALL STRUCTURES ARE PROPOSED
<br />NORTH
<br />OPEN PIT MINING AREA, 1986
<br />BY NORTHERN MINERALS, INC.
<br />f
<br />ADJOINING USES, WILDLIFE HABITAT
<br />ROAD TO BE GRADED INTO TERRAIN
<br />CONTOURS, RIPPED, SOIL APPLIED,
<br />MULCHED AND SEEDED .�
<br />EXHIBIT E Rece!vPri
<br />RECLAMATION PLAN SEP 3 0 w"i
<br />REVISED 9/4/1994
<br />Durango Kiehl CJ;fs'cA
<br />m
<br />Division w Minerals & Goolotly
<br />SCALE 1" = 50'
<br />DEADWOOD GULCH MINERALS COMPANY
<br />(DGMC)o
<br />PO BOX 96
<br />EMEo
<br />HESPERUS, CO 81326
<br />6/27/1994
<br />_Permit Number
<br />(
<br />(� Class. OPennit
<br />I
<br />SectioMEn_hibit L
<br />BOB HILL Oiassa:� ® /Revii - s!gnn
<br />Class: OReport Cl Hydro OGenerel
<br />Doc Type:
<br />DApplication (Coal only) 3 Bond D Enforcement D Inspection -
<br />
|