My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-07-27_REVISION - M1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981044
>
2004-07-27_REVISION - M1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:16 PM
Creation date
11/21/2007 10:34:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Revision
Doc Date
7/27/2004
Doc Name
Amendment Application
From
DMG
To
Solberg Gravel LLC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interface with the reclamation of the site. Using these acreage limitations in the mining <br />plan (and reclamation cost calculations) should provide the proper controls required to <br />insure complete reclamation of the site. When a limit is reached in any particulaz <br />category, alterations in the operation must occur to avoid exceeding the limitations or the <br />limitations must be increased (and therefore the bond) to allow for greater amounts of <br />land in that particulaz category. <br />Disturbance Cateeorv Distributions: <br />Maior Disturbance: Major disturbance is defined as the areas were mining is occumng at <br />a particular point in time, plus the location of topsoil stockpiles. Because the mining area <br />is rather small, most of the major disturbance is occupied by soil stockpiles. The area is <br />set at 5 acres for a combined mining area and soil stockpile area. It is understood that <br />when the acreage is reached then a reduction in the actual major disturbance area is best <br />accomplished by converting it directly to a minor disturbance area by replacement of the <br />topsoil followed by prompt seeding of the land. <br />Moderate Disturbance: Moderate disturbance is defined, in this operation, to include the <br />final grading of pit slopes and the pit bottom, topsoil distribution (not planted), the access <br />road, and any material stockpiles. This azea is set at 12 acres because topsoil <br />redistribution will be followed almost immediately by planting. Therefore, the acreage <br />includes primarily all activities other than those contained in the major disturbance or <br />land currently under final reclamation. <br />Minor Disturbance: Minor Disturbance, for this operation, includes land that has been <br />reclaimed but has not yet been released from bond. The acreage included in this category <br />assumes a 5 year term after seeding until bond can be released. At the rate of 1.5 acres <br />per year placed under reclamation, the minor disturbance category would need to contain <br />at least 7.5 acres. The figure for minor disturbance will therefore be set at 8 acres. <br />Total Acreaee Disturbed: Assuming some point is reached where all acreages that can be <br />disturbed, under these categories, is disturbed the amount of land would tota125 acres. <br />This is approximately 27 % of the entire area to eventually be mined. Of those 25 acres, <br />17 acres would be at some stage prior to final revegitation (mining, stockpiling, access, <br />etc.) and 8 acres would be in some stage of revegitation. <br />Minine/Reclamation Coordination: The acreages listed in these categories provide the <br />limits on the extent of the operation. The major disturbance category includes the actual <br />mining area and is fairly constant. Therefore, for the mining area, the shift from major to <br />moderate disturbance is essentially automatic. <br />The shift from major disturbance (soil stockpiles) and moderate disturbance to minor <br />disturbance, on the other hand, requires an action by the permittee to physically alter the <br />land so the transfer occurs. Therefore, when the moderate disturbance category reaches <br />its limitation or the total of mining and soil stockpiles reaches the major disturbance <br />limitation, land in the respective category must be shifted to another category. <br />
The URL can be used to link to this page
Your browser does not support the video tag.