My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-21_REVISION - M1984117 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984117
>
2002-05-21_REVISION - M1984117 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:16 PM
Creation date
11/21/2007 10:31:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984117
IBM Index Class Name
Revision
Doc Date
5/21/2002
Doc Name
Receipt of Completeness Response Package (s/b M-1984-117)
From
DMG
To
Fremont County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 128 <br />Construction Materials Rule 6 <br />affected azea. A narrative description must be provided in Exhibit B - <br />Site Description; and <br />(f) outline and label existing disturbance within and/or <br />adjacent to the permit boundary (e.g., previously mined areas, roads or <br />excavations resulting from utility construction). Re-disturbance of <br />previously disturbed areas, by the proposed mining operation, must be <br />included in the permit area and addressed in Exhibit D -Reclamation <br />Plan. <br />(3) Reclamation Plan Man <br />(a) show the gradient of all reclaimed slopes <br />(horizontal:vertical) sufficient to describe the post mine topography; . <br />(b) indicate where vegetation will not be established and the <br />general area(s) for shrub or tree planting; <br />(c) if ponds aze a pazt of the Reclamation Plan, outline the <br />final shore configuration of the ponds and shallow aeeas if the future <br />land use is for wildlife; <br />(d) state the average thickness of replaced overburden by <br />reclamation area or phase; and <br />(e) .state the average thickness of replaced topsoil by <br />reclamation azea or phase. <br />6.3.6 EXHIBIT F -List of Other Permits and Licenses Required <br />Provide a statement identifying which of the following permits, licenses and <br />approvals which aze held or will be sought in order to conduct the proposed <br />.mining and reclamation operations: effluent discharge permits,. air quality <br />emissions permits, radioactive source materials licenses, disposal of dredgc and <br />fill material (404) permits, permit to construct a dam, well permits, explosives <br />permits, State Historic Preservation Office clearance, highway access permits, <br />U.S. Forest Service permits, Bureau of Land Management permits, county <br />zoning and land use permits, and city zoning and land use permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.