Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND <br />Departrnent of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303)83ZA106 <br />May 28, 2003 '/ <br />Mr. Mazk Nichter <br />Continental Materials Corporation <br />225 W. Wacker Dr., Ste. 1800 <br />Chicago, IL 60606-1229 <br />Re: Daniels Sand Pit 2, Permit No. M-1973-007-SG, Succession Approval, Revision No. SO-1 <br />Deaz Mr. Nichter: <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />REC LAM ATION•NINING <br />SAFETY•SCIENCE <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />On May 28, 2003, the Division of Minerals and Geology approved the succession of operators from Transit Mix <br />Concrete to Continental Materials Corporation for this operation. Continental Materials Corporation is now the <br />permitted operator of the Daniels Sand Pit 2, and as such, is responsible for all provisions in Permit No. M-1973- <br />007-SG, as well as those specified in the Rules and Regulations. Transit Mix Concrete is relieved of all <br />responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, aze an integral part of your permit. They <br />have been incorporated into the pemrit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the pemtit and the <br />permit application at the mining operation as a reference for operating personnel, to help ensure compliance with <br />the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to <br />determine if a modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />,~,/ atry osey <br />Y Acting Senior Environmental Protection Specialist <br />cc: B. J. Fuller, Transit Mix Concrete <br />Office of Office of Colorado <br />Mrbea'~69Y1'lLaH21ffii~IOA_M197300]SG_BMK_2003052g_25048 PM.dOC Active and Inactive Mines Geological Survey <br />