My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-15_REVISION - M1981302
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1999-06-15_REVISION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 4:42:09 PM
Creation date
11/21/2007 10:29:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
6/15/1999
Doc Name
RESPONSES TO COMMENTS SUBMITTED TO MLRB IN OBJECTION TO APPROVAL OF WESTERN MOBILE DEEPE PIT AMENDM3
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 <br /> the area to be reclaimed, the operator might be enhancing the property from a future <br /> development perspective. However,as stated previously, an increase in the acreage of <br /> land surface is not contrary to the post-mining land uses of wildlife habitat and general <br /> agriculture. <br /> In order to develop the land, the operator would either have to successfully achieve <br /> these post-mining land uses, and obtain bond release and reclamation permit <br /> termination, at which time the land owner would be free of any regulation under the <br /> Land Reclamation Act for the Extraction of Construction Materials as to how the land <br /> is managed, or the operator would have to obtain approval of a permit amendment <br /> changing the post-mining land use to industrial/commercial. <br /> tatute-and-theTegulations-arEpettinent-to-an-operatoes <br /> --riglfts to modify an approved reclamation plan or change the specified post-mining land <br /> \ p uses. <br /> t T 3 (3 overnmental office er than the board, nor <br /> S t, any political subdi ate shall have the authority to issue a <br /> �A reclama ermit pursuant to this artic require reclamation standards <br /> Brent t��a�those te� s bli�held in this article... <br /> 34-32.5-112(7)(a)_An operator may, within the term of a reclamation Permit, <br /> apply to the board or the office-for a reclamation permit amendment to increase <br /> the acreag— a to beaffected or otherwise revise the reclamation plan... <br /> R le 3.1.4>-Establishg" P� is Mining Land Uses Sri k s <br /> (1) In consultation with the Landowner, where possible, and subject to the <br /> approval of the Board or Office, the Operator shall choose how the <br /> affected lands shall be reclaimed. These d st <br /> rang inn hoaic,ltural-ltpmestte— creational;industrial,-or-other <br /> uses, including-food,-shelter-and d rover f___ or wildlife. <br /> (2) td <br /> results of ese decisi s shall ormulate tntgv Rlc amation11F <br /> asspe�ifte in Subsec ons 6. �4 0 6.4 as �uired for the size �"` ttype ope tion. a s 5 ^' ai"� <br /> ule 6.4.5Iree <br /> a) - The Re anon P1 hall inclu e a dbsc ' of the <br /> ype(s) oflamation theerator/Appl cant prop ses t achievein the <br /> eclamatiothe affected Ian why, was chosen [of creage <br /> accorded to each, and/a gener4cussionlof the methods of reclama " 'n as <br /> rela d to the rhe_cglolucs of earthmoving. TLD <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.