Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY / <br />Department of Natural Resources <br />1313 Sherman S[., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />June 2, 2003 <br /> <br />Mr. Mazk Nichter <br />Continental Materials Corporation <br />225 W. Wacker Dr., Ste. 1800 <br />Chicago, IL 60606-1229 <br />Re: Pueblo East >iit, Pernut No. M-19>I6-ills, Succession Approval, Revision No. SO-2 <br />Deaz Mr. Nichter: <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />0.EC LAM ATION•NINING <br />SAFETT•s CIEN CE <br />gill Owens <br />Governor <br />Greg E. Walther <br />Executive DireROr <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />On May 14, 2003, the Division of Minerals and Geology approved the succession of operators from Transit Mix of <br />Pueblo, Inc. to Continental Materials Corporation for this operation. Continental Materials Corporation is now the <br />permitted operator of the Pueblo East Pit, and as such, is responsible for all provisions in Permit No. M-1986-015, <br />as well as those specified in the Rules and Regulations. Transit Mix of Pueblo, Inc. is relieved of all <br />responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, aze an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this trailing. We suggest that you keep a copy of the pem»t and the <br />pernut application at the mining operation as a reference for operating personnel, to help ensure compliance with <br />the terms of the pemtit. <br />2. Changes in the mining and reclamation operations that differ from those described in the petmit may <br />require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to <br />detemtine if a modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.11 to Conversions. <br />3. On your pem3it anniversary date each yeaz, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />_. <br />Harry H. osey <br />Acting Senior Environmental Protection Specialist <br />cc: B. J. Fuller, Transit Mix of Pueblo, Inc. <br />Office of Office of Colorado <br />Mined Land Reclamation Active and InaRive Mines Geological Survey <br />