My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-05-16_REVISION - M1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981022
>
2005-05-16_REVISION - M1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:07 PM
Creation date
11/21/2007 10:27:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981022
IBM Index Class Name
Revision
Doc Date
5/16/2005
Doc Name
DMG Reclamation Cost Estimate
From
DMG
To
Connell Resources Inc
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Est imating Software <br /> BULLDOZER R IPPING WORK <br />PROJECT IDENTIFICATION <br />Task # 003 State Cniorrrdn PormiVjob # :iN-1981-022 <br />Dato 0&12/2005 County Lanmor Abbrovialion :none <br />User : ESC Slte :Glass Gravel Pif Filename : M02 2-003 <br />Agoncy or organization name DAQG <br />Permit or other Job action : AM~U7 <br />Task descripUCn Rip Shalo Irom pit floor to construct liner <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cal D8R Serves 11 - 8SU Horsepower : 310 <br /> Blado typo : SemaUnrvnrsal <br /> Attachment no. t : ROPS Cab Shill basis : 1 per day <br /> Attachment no. 2 : I shank upper <br /> Data sourco : (CRG) <br /> Utilization °lo <br />~os~&oakdown : Ownership costlhour : S49 91 NA <br /> Dozor oporalmg wstRtour : 569.32 100 <br /> Ripper operating cosVtwur : S 10. it 100 <br /> Oporator cosUhour : 531.78 NA <br /> Total unit cost/hour , S 161. f3 Total 8emt wsVtqur : 5161.13 <br />MATERIAL QUANTITIES <br />Sclorted oshmahng mothod <br />Area <br />Alternate methods - <br />Salemic : NA NA Load (actor : NA Bank volume NA BCY <br />Area : 7.00 acres Rlp depth (H) : 3.50 Volume 39,527 BCY or CCY <br />Source of estimated quantity :OMG Estimate <br />Sourco of estimated load factor ; NA <br />HOURLY PRODUCTION <br />AlUxnate mQthdd>.• Job CO it rtOtiwn~~Qr~_ <br />Solamic : Sorsmic volocity : NA IooVsecond Unadjustod prarluction <br />Unadjusted production : NA cu. yds.lttour per selected method i, 782.44 cu. ydsJhour <br />Area : Avg. dppmg depth 2.00 foeL'pass Sito altitude : 5.000 foe( <br />Avorage ripping width 5.56 IeeUpass Altitude adjustment . ! 00 (Cat HB) <br />Average ripping length 100.00 feeVpass Job etticrency factor : 0 83 <br />^ (t shdUday) <br />Average dozer speed : 88.00 teeL'minule Net pb correction : 0 83 multiplier <br />Average manouver Ume : 0.25 minuteslpass <br />Production pcr unit area : 0.552 ocres)hour Adjuslod unit production t -t?ii as cu. ydsJlrour <br />Una:fµrstrd proAuction ~ 1,787.44 cu. yds.lhaur Adjusted fleet production : 1,479A3 cu. ydslhour <br /> <br />JOB TIME AND COST <br />Floel size : t dozers) Total pb limo : 26.72 hours <br />Unit cost : 50.109 per cu. yd. Total job cost : 54,305 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.