My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-31_REVISION - M1980055HR
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980055
>
2007-05-31_REVISION - M1980055HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:12 PM
Creation date
11/21/2007 10:25:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980055HR
IBM Index Class Name
Revision
Doc Date
5/31/2007
Doc Name
Response to Completeness Review
From
Denison Mines
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table E-1 <br />BLM Approved Reclamation Seed Mixture <br />Common Name S ecies Name Varlet PLS (Ib/ac)1 <br />Sand dro seed Sporobolus cryptandrus VNS 0.07 <br />Gelleta Hilariajamesii Viva, florets 2.47 <br />Big sagebrush Atemesia tridentate VNS 0.10 <br />Winterfat Krascheninnikovia Janata VNS 0.25 <br />Four-win saltbrush Atiplez canescens VNS 0.25 <br />Indian ricegrass Achnatherum hymenoides Rimrock 3.71 <br />Blue gramma Chrondosum gracile Alma 0.48 <br />Mutton rass Poa fendleriana VNS 0.10 <br />Squirrel tail Elvmus elymoides Bottlebrush 2.04 <br />Total 9.47 <br />Note: <br />1 Application rates may be reduced by half for any drilled areas. <br />Revegetation efforts will be monitored on a periodic basis to ensure that revegetation efforts are <br />successful In the event that revegetation is not successful, especially on steeper slopes (2H:1 V), <br />Denison will attempt to re-vegetate the area by alternative methods which might include new <br />erosion control technologies, slope reduction, mulching, or hydroseeding. If successive efforts to <br />re-vegetate the area are unsuccessful, the areas will be regraded to ensure revegetation. <br />E.1.2.3 Fertilization <br />No fertilizers will be applied to revegetated areas. Experience has shown that in areas where soils <br />historically have exhibited nutrient limitations, the reclaimed soils also continue to be low in <br />plant-available nutrient content; as a result, the use of fertilizers has resulted in the proliferation <br />of invasive species populations and prohibited the growth of native species (www.forester.net). <br />E.2 Proposed Reclamation Schedule <br />The anticipated life of the Topaz Mine is 20 years. Based on this estimation, reclamation of the <br />mine area will commence in 2027, immediately following mine closure. Reclamation activities <br />are estimated to take 8 to 10 weeks. Monitoring of the mine area is expected to continue for an <br />additional 3 years. Whenever feasible, disturbed areas will be reclaimed concurrently with mine <br />operations. <br />5-23-2007 Exhibit E Rec Plan 1?-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.