My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-21_REVISION - M1999034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999034
>
2003-10-21_REVISION - M1999034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:15 PM
Creation date
11/21/2007 10:21:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Revision
Doc Date
10/21/2003
Doc Name
Concurrence with changing the permit # of the Topper well requiring DIMP sampling
From
ADCO Consulting
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/21/2003 12: 5B 3034524515 ADCO_BAYER_CHEROKEE_ PAGE 01 <br />RECEIVED <br />OCT 21 2003 ~ <br />AD CCU Consu Ztl ng Division ~f Minerals and Geology <br />20901;. 104th Avenue, #305 <br />Thornton, Colorado $0233 <br />450-2204 <br />C -Fax: 452-4515 <br />~ _ <br />~,A7C TRANSMISSION COVER. SHEET <br />Date: October 21, 2003 / <br />Ta: Division of Minerals and Geology, c% Larry Oehler <br />cc. Aggregate ,industries, c% Mike Refer <br />Fax: 303-832-$106 (DMG); 3~03-716-5209 (Aggregate Industries) ~ ' <br />Re: Permit No. M-1999-034; Aggregate Industries- WCR, InG ~ / <br />Cooley Reservoir dtFulton Wildlife Area, AM-1, Jeronimus Property <br />Sender: Robert N. Fleming <br />YOU SHOULD R.ECEXVE 1 PAGl;'(S), INCLUDING THIS COVER SH1;ET. IF <br />YOU DO NOT RECEIVE ALL TH,E PAGES, PLFAS,E CALL 45U-2204. <br />I talked with dike Refer of Aggregate Industries on the phone today, and he asked me to send this <br />fax to you as his~ncurrence with changing the permit # of the Topper well requiring DIMP <br />sampling <br />On the requirement for a forma] submittal of the D1MP sampling protocol, I am having the consultant <br />who is performing this unction prepare the protocol for your review, This isn't required until we <br />begin mining, altd we are still going through the County's and SEO's process. Therefore, I haven't <br />been in any hurry to complete submission of the protocol, but it will be submitted to you for review <br />and approval prior to mining being undertaken. <br />If you need anything else on either of the above items at this time, please call and let me know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.