My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-19_REVISION - M1977416
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977416
>
2006-09-19_REVISION - M1977416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:04 PM
Creation date
11/21/2007 10:20:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977416
IBM Index Class Name
Revision
Doc Date
9/19/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIPICATION <br />Permitfjob # <br />: M-1977.416 <br />Task # : 005 State :Colorado <br />Date : 09/19/2006 County :San Miguel Abbreviation :none <br />User : RCO Site :Carnation Mine Filename : M416-005 <br />Agency or organization name :DRMS <br />Permit or other job action :Final reclamation (TR-01) <br />Task description :Ripping compaction on mine roads and dumps <br />HOURLY EQUIPMENT COST <br />Basic machine : <br />Cat D6R LGP - 6S (2003) Horse ower : 185 <br />P <br /> Blade type <br />Attachment no. 1 :Straight <br />: ROPS Cab <br />Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour <br />Dozer operating cosUhour <br />Ripper operating cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Ar¢a : 3.10 <br />Utilization <br />$31.45 NA <br />$44.58 100 <br />$2.95 100 <br />$32.78 NA <br /> <br /> <br /> <br /> <br />• $111.76 Total fleet cosUhour : $111.76 <br />Selected estimating method : Area <br />NA Bank volume : NA BCY <br />1.00 Volume : 5,001 BCY or CCY <br />NA Load factor <br />acres Rip depth (ft) <br />Source of estimated quantity :TR-Ot <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg, ripping depth : 1.00 feetpass <br />Average ripping width : 6.58 feeUpass <br />Average ripping length : 200.00 feeUpass <br />Average dozer speed : 88.00 feetlminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.719 acres/hour <br />Unadjusted production : 1,159.24 cu. yds./hour <br />JOB T{ME AND COST <br />Fleet size : 1 dozer(sj <br />Unit cost : $0.116 per cu. yd. <br />Unadjusted production <br />per selected method : 1,159.24 cu. yds./hour <br />Site altitude : 5,800 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production :_ 962.17 cu. yds./hour <br />Adjusted fleet production : 962.17 cu. yds /hour <br />Total job time : 5.20 hours <br />Total job cost : $581 _ ____________ _____ _ „_„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.