Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Total sheet 2 of 2 <br /> <br />Description Fleet Size Haul Trip Return Trip <br /> <br />-Flatbed Truck <br />4x2 <br />30KC <br />VW CosUhour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />, <br />, <br />, <br />-Light Duty Pickup, 4x4, 3/4 T $46.34 <br /> <br />$30 <br />69 1 $46.34 <br />$46.34 <br /> . 1 $30.69 <br />$30.69 <br />Subtotals :~ $77.04 $77 pq <br />EQUIPMEN7 HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Pagosa Springs <br />Transportation Cvcle Time ~ Non- <br /> Total one-way travel distance : 3 <br />0 <br /> <br />Roadable <br />Roadable <br />Average travel speed . . <br />miles <br />30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.10 0.70 Total non•roadable mob/demob cost " : $1 <br />176 <br />53 <br />Return Time (hours) = 0.10 0.10 • lwo round mps wIm haw rig , <br />. <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cast": $15 <br />41 <br />Unloading time (hours) = 0.50 NA ° . <br /> one mood mp, no nao~ dg <br />Subtotals = 1.20 0.20 <br />JOB TIME AND COST ~~ ~ Total jobtime ; ~~ 2.40 hours <br />,_ ;:: _- __ ___ _ __ ___.._,,, ___ Total job cost ; 81.199 <br />