Laserfiche WebLink
• Exhibit A - Henderson Mine and Mill Permit Amendment <br /> LEGAL DESCRIPTION <br /> The linear conveyor route is located southeast of the Henderson Mill site east of Ute <br /> Pass along the East Branch of the Williams Fork River in Grand County, Colorado. <br /> The conveyor will be routed through portions of 4 separate sections. The general legal <br /> description is: <br /> • Section 36; T2S, R78W; <br /> • Section 1; T3S; R78W; <br /> • Section 6; T3S; R77W; <br /> • Section 7; T3S; R77W <br /> • 6th Principal Meridian <br /> • <br /> • <br />