Laserfiche WebLink
List of Tables <br /> • <br /> Table 1. Applicable Reclamation Plan Performance Requirements and <br /> Included Implementation Measures. <br /> Table 2. Modified Climax Seed Mix 1 — Interim Reclamation. <br /> Table 3. Reclamation Area Acreages and Reclamation Tasks. <br /> Table 4. General Reclamation Timetable. <br /> Table 5. Modified Climax Seed Mix 2 — Final Reclamation. <br /> JIM <br /> ii <br /> January 16,1996 <br /> Plan tlx <br />