My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-21_REVISION - M1998013 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-01-21_REVISION - M1998013 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:13 PM
Creation date
11/21/2007 10:08:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
1/21/2003
Doc Name
DRAFT Slurry Wall Construction Specifications
From
Tetra Tech
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1-GENERAL REQUIREMENTS <br />SECTION 01310 -CONSTRUCTION SCHEDULES <br />1.01 GENERAL <br />A. Prepare detailed schedule of all construction operations and procurement to be reviewed <br />by the Engineer prior to commencing construction. <br />No work is to begin at the site until Engineer's acceptance of the Construction Progress <br />Schedule and Report of delivery of equipment and materials. <br />1.02 FORMAT AND SUBMISSIONS <br />A. Prepare construction and procurement schedules in a graphic format suitable for <br />displaying schedule and actual progress. <br />B. Submit two copies of each schedule to the Engineer for review. <br />The Engineer will return one copy to the Contractor with revisions suggested or <br />necessary for coordination of the Work with the needs of the Engineer or others. <br />1.03 CONTENT <br />A. Construction Progess Schedule <br />Show the complete Work sequence of construction by activity and location. <br />2. Show the dates for the beginning and completion of <br />a. Slurry walt construction in maximum 10 working day increments. <br />b. Earthwork operations. <br />c. Testing. <br />Show projected percentage of completion for each item as of the first day of the <br />month. <br />B. Report of delivery of equipment and materials <br />1. Show delivery status of critical and major items of equipment and materials. <br />2. Include a schedule which includes the critical path for Shop Drawings, tests, and <br />other submittal requirements for equipment and materials. <br />1.04 PROGRESS REVISIONS <br />A. Submit revised schedules and reports when changes are foreseen or when required by the <br />Engineer. <br />B. Show changes occurring since previous submission. <br />Draft - Techncial Specifications <br />01/99 Section 01310 -Page 1 of 2 <br />