Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION O F <br />M[N &RALS <br />GEOLOGY <br />RECLAMATION•MIN ING <br />SAFETY•SCIENCE <br />November 24, 2004 Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Mr. Phil Barnes <br />Ronald W. Cattany <br />Manager Environmental Resources Division Director <br />Cripple Creek &Victor Gold Mining Company Natural Res°urce Trustee <br />P.O.BOX 191 <br />Victor, Colorado 80860 <br />Re: As- Built Certification Report for 2004 Modified Amendment # 7 VLF Boundary <br />Construction, Cresson Project, Amendment # 7, M-1980-244 <br />Dear Mr. Barnes: <br />The Division has reviewed the as built Certification Report for the modified Amendment <br /># 7, VLF boundary liner construction, Ore Storage Area (OSA), Submitted on November <br />5, 2004. The report was reviewed to ensure that the approved material and construction <br />specifications, as well as material and construction testing, have been complied with and <br />that the ore storage area was constructed in accordance with the MLRD BOARD <br />approved design plan. <br />The Division's review indicated that the appropriate testing protocol was followed, in <br />accordance with Rule 7.4 Of The Hard Rocks and Metal Mining Rules and Regulations <br />of the Mined Land Reclamation Board. <br />The report is in compliance with Rule 7.3 and is accepted by the Division. CC&V can <br />now commence with the application of solution. <br />If you have questions or concerns, please contact me. <br />Sincerely, <br />Berhan Keffelew <br />Reclamation Specialist. <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />