My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-23_REVISION - M1977424
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977424
>
2006-01-23_REVISION - M1977424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:23:00 PM
Creation date
11/21/2007 10:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Revision
Doc Date
1/23/2006
Doc Name
Release Approval Cost Est. Recalc and Request for Evaporation Pond
From
DMG
To
Occidental Oil Shale Inc.
Type & Sequence
AR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : o4a <br />sheet 2 of 2 <br />Loading Tool Cvcle Time : Number of loading tool passes required to f ll truck : 3 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders -material descr.:NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and Bumf NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile: NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dumptarget: NA NA NA <br /> Net cycle time atljustment : NA manures <br /> Adjusted loader cycle time (total time per loader pass) : 0.316 minutes <br /> Net load time per truck' : 0.732 minutes <br />TrUCk CVCIe Time: 'bulk of lst loatler cycle wmpletetl dudngtruck exchange if adj. loatler cycle time <exchanga time <br />Truck exchange time ": 0.50 minutes........ Adjusted for site altitude : 0.515 minutes <br />Truck load time: 0.732 minutes........ Adjusted for site altitude : 0.732 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.825 minutes <br />"set at 0 if exchange time <adj. loader cycle time (truck exchange completetl during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : NA-user <br /> <br />Road <br />segments Haul distance <br />(miles) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(miles hour) Travel time ` <br />(minutes) <br />1 2 NA-user NA-user NA-user 35 3.429 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time" ~ 3.429 minutes <br />1 2 NA-user NA-user NA-user 35 3.429 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />' travel time shown far each segment inclutles acceleration/deceleration adjustment KetUfn lime'-: J.9[9 nmtutes <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 8.929 minutes <br />Loading tool unit production : 453.01 LCY/hour...... Adjusted for job efficiency : 376.00 LCYlhour <br />Truck unit production : 63.29 LCY/hour...... Adjusted far job effciency : 52.53 LCY/hour <br />Optimal no. trucks/loading tool : 7 trucks........... Selected no. trucks/loader: 7 trucks <br /> Adjusted hourly truck team production : 367.70 LCY/hr <br /> Adjusted hourly single truck/loader team production : 367.70 LCY/hr <br /> Adjusted hourly multiple trucWloader team production : 367.70 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 8.77 Hours <br />Unit cost : $1.657 /LCY Total jab cost : $5,345 <br />
The URL can be used to link to this page
Your browser does not support the video tag.