My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-23_REVISION - M1977424
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977424
>
2006-01-23_REVISION - M1977424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:23:00 PM
Creation date
11/21/2007 10:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Revision
Doc Date
1/23/2006
Doc Name
Release Approval Cost Est. Recalc and Request for Evaporation Pond
From
DMG
To
Occidental Oil Shale Inc.
Type & Sequence
AR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 01/20/2006 <br />User: SSS <br />County : Gafield <br />Site :Logan Wash <br />Agency or organization name : DMG <br />Permit or otherjob action : SL-Of <br />Task description : Rlp dnd <br />__ _ __ <br />HOURLY EQUIPMENT COST <br />bench and research bench <br />Basic machine :CAT 16H <br />Attachment no. 1 : NA <br />Attachment no. 2 : Mulfi-shank <br />State :Colorado <br />Cost Breakdown Ownership cosUhour <br />Grader operating cost/hour <br />Ripper operating wsUhour <br />OperatorcosUhour <br />Total unif ngsf/hour <br />Utilization <br />Horsepower: 275 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$54.36 NA <br />$57.02 100 <br />$2.06 50 <br />$31.97 NA <br />$145.42 Total fleet cost hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 3.10 acres <br />Source of estimated acreage : TR-04 <br />HOURLY PRODUCTION <br />$145.42 <br />1 <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees ' ' at 0 degrees, blade is perpendicular <br />Effective blade length : NA feet to direction of travel. <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 9.75 feet " "width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.7727 acres/hour <br /> <br />Job Condition Correction Factors Source <br />Average site altitude : 7,750 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.80 (ish/d, adv.J <br /> Net job correction : 0.8000 multiplier <br />Adjusted hourly unit production : 1.4182 acres/hour <br />Adjusted hourly fleet production : 1.4182 acres/hour <br />Permifrob # : M-1977-424 <br />Abbreviation :none <br />Filename : M424-03a <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 2.19 hours <br />Unit cost : $102.54 per acre Total job cost : $318 <br />
The URL can be used to link to this page
Your browser does not support the video tag.