Laserfiche WebLink
one neRl F Fnl IIPM FNT <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />CosUhr/fleet <br />-Generic 8-10 cy, 6x4 $53.20 7 $372.41 $372.41 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $372.41 $372.41 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Grand Junction <br />Transportation Cvcle Time : Non- Total one-way travel distance : 45.0 <br />Roadable Roadable Average travel speed : 40.0 <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />1.12 1.12 <br />1.12 1.12 <br />0.50 NA <br />0.50 NA <br />3.25 2.25 <br />sheet 2 of 2 <br />_i <br />miles <br />mph <br />Total non-roadable mob/demob cost * : $4,453.24 <br />'two round trips with haul rig <br />Total roadable mob/demob cost ** : $837.93 <br />"one round trip, no haul rig <br />Total job time : 6.50 hours <br />Total job cost : $5,291 <br />