Laserfiche WebLink
TrucklLoader Team Work cont'd Task # : 17a <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck <br />Excavators and front shovels -machine cycle time vs, job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA <br />3 <br />NA bump <br />sheet 2 of 2 <br />passes <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumt NA minutes <br />Cycle Time Factors Loading Condition Description Factor {min.) Source <br />Material : NA NA NA <br />Stockpile: NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.316 minutes <br /> Net load time per truck `: 0.732 minutes <br />Truck DVCIe Time : ' bulk of ist loader cycle completed tluring truck exchange if atlj. loader cycle time <exchange time <br />Truck exchange time ": 0.50 minutes........ Adjusted for site altitude : 0.515 minutes <br />Tmck load time: 0.732 minutes........ Adjusted for site altitude : 0.732 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude: 0.825 minutes <br />"set al0 if ezchange time <adj. loader cycle time (truck exchange completed tlering 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : NA-user <br />Haul route <br />Road <br />segmem# Haul distance <br />(mllesJ Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%j Speed <br />(miles/hour) Travel time' <br />(minutes) <br />1 2 NA-user NA-user NA-user 35 3.429 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute: Haul time": 3.429 ~ <br />1 2 NA-user NA-user NA-user 35 3.429 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />' travel time shown for each segment includes accelera[ionldeceleration adjustment Return time": 3.429 mintlteS <br />°total Haul and rawrn r,na ahown mcmdes alrmde adjustmem Total truck cycle time: 8.929 minutes <br />Loading tool unit production : 474.58 LCY/hour...... Adjusted for job efficiency : 393.90 LCY/hour <br />Truck unit production : 66.30 LCY/hour...... Adjusted for joh efficiency : 55.03 LCY/hour <br />Optimal no. truckslloading tool : 7 trucks........... Selected no. trucks/loader: 7 trucks <br /> Adjusted hourly truck team production : 385.27 LCV/hr <br /> Adjusted hourly single tmck/loader team production : 385.21 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 385.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 0.26 Hours <br />Unit cost : $1.582 /LCY Total job cost : $158 <br />