My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-23_REVISION - M1977424
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977424
>
2006-01-23_REVISION - M1977424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:23:00 PM
Creation date
11/21/2007 10:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Revision
Doc Date
1/23/2006
Doc Name
Release Approval Cost Est. Recalc and Request for Evaporation Pond
From
DMG
To
Occidental Oil Shale Inc.
Type & Sequence
AR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : '~ I3o~ <br />Date : 01/20/2006 <br />User: SSS <br />State :Colorado <br />County : Gar(eld <br />Site:Logan Wash <br />Permivjob # : M-1977-424 <br />Abbreviation :none <br />Filename:M424-Y~ L3~ <br />Agency or organization name :DMG <br />Permit or otherjob action :SL-Ot <br />Task description :Pull up road outslopes where vegetation not well established <br /> <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 3458 L - VG Series 11 Horsepower : 321 <br /> Weight (MT) : 46.19 <br />Cost Breakdown : Utilization <br />Ownership cosuhour : $50.69 NA Shift basis : 1 per day <br />Operating cosuhour : $57.57 100 Data source : (CRG) <br />Operatorcosuhour: $31.97 NA <br />Total unit cosuhour : $140.22 Total fleet cosuhour : $140.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 33,200 LCY factor : NA <br />Source of estimated volume :Estimate 40001. f, at 8.3 c.y./l.f <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Loose <br />volume : 33,200 LCY <br />Excavator Cvcle Time (load bucket swino loaded. dump bucket swing emptvl <br />Basic job condition description : AVERAGE <br />Secondaryjob condition within basic description : AVERAGE <br />Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />2.99 LCY (heaped) Bucket size class : medium <br />0.68 Rock -Well blasted (60% - 75%) <br />2.02 LCY <br />Job Condition Correction Factors <br />Site altitude : 7, 700 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.441 per LCY <br /> Source <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />383.21 LCY/hour <br />318.07 LCY/hour <br />318.07 LCYlhour <br />Total job time : 104.38 hours <br />Total job cost : $14,637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.