My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_REVISION - M1985219
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985219
>
2002-07-30_REVISION - M1985219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:12 PM
Creation date
11/21/2007 10:07:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985219
IBM Index Class Name
Revision
Doc Date
7/30/2002
Doc Name
Reclamation Cost Estimates for AM-01 and current conditions
From
DMg
To
Milton Derrick
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DMG <br />Task # : 005q State :Colorado Pennit<oh # : M-1988-219 <br />Date: 07/25/2002 County:Mesa Abbreviation :none <br />User: GRM Site :32 ROad Pit Filename :M219-005 <br />Permit or other jab actlon :Final Reclamation Cost Estimate <br />Task description : place bacMill around house slope <br />HOURLY EOUIPMEN7 COST <br />Model:Cat 633E Sedes2 <br />Shfft basis: <br />lperday <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cosVhour: $72.62 NA <br />Ope2ting cosMrour: $110.00 100 Weight (UST): 56.34 <br />OpemtorcosVhour: $30.84 NA Cost data source: (CRG) <br />Total unit cosf/hour: $213.46 Total fleet wsUhour: $426.92 '.. <br />Inttfal Swell Loose '.. <br />volume: 8,869 LCY factor : NA volume: 8,889 LCV <br />Spume of Quan tity takevtf: . _ ... .. '. <br />Source of estimated swell factor : NA <br />HOURLV PRODUCTION <br />C <br />' <br />aoai N <br />Haul <br />no <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) Basis <br />Material vrelgM : 2,550 pounds/LCY Struck volume : 23.20 LCY <br />Material description: Heaped volume: 34.00 LCY <br />Earth-Orypacked Average volume: 28.60 LCY <br />Rated payload: 82,000 pounds ', <br />Payload capacity: 32.16 LCV Adjusted capacity: 28.60 LCY "' <br />Cvde Tima(load+haul+soread +retuml: Loading time: 0.90 minutes' <br /> Maneuver and spreading time: 0.70 minutes <br />Travel time : 'loading time per pair on push-pull motlels <br />Route ~ Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (ipm) Travel time (min.) <br />Haul: 400 16.5 50 21.5 218 1.67 'nutes" <br />Retum : 400 -16.5 5.0 •11.5 2,039 0.40 minutes -' <br />"travel time edlustetl for aaeleration and tlecelerelion at load and dump pants <br />Job Condit'on Correction Factors <br />Site altitude (feet) ; <br />4, 700 <br />Altifude adjustment factor : 1.00 <br />Job efficiency factor, 0.83 <br />Not job correction factor; 0.83 <br />JOB TIME AND COST <br />Fleet size; 2 Sc2per(s) <br />Total cycle time 3.87 minutes <br /> <br />Adiusted Houtjy Production ~ '.. <br />Unadjusted unit praductidn : 442.87 LCV/Hour"- <br />Adjusted unit production : 367.58 LCVMOUr <br />Adjusted fleet production : 735.17 LCYMOUr <br />2 times volume on push-Dull models <br />Total fob time : 12.09 Hours <br />Unit cost; $0.581 /LCY Total job cost $5,162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.