My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_REVISION - M1985219
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985219
>
2002-07-30_REVISION - M1985219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:12 PM
Creation date
11/21/2007 10:07:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985219
IBM Index Class Name
Revision
Doc Date
7/30/2002
Doc Name
Reclamation Cost Estimates for AM-01 and current conditions
From
DMg
To
Milton Derrick
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~RCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 4, <br />Date : 07/25/2002 <br />User : GRM <br />Pennitfjob# : M-1985-219 <br />Abbreviation :none <br />Filename : M219-002 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task descdption :Push topsoil over sloped areas around field <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : i per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $48.47 NA <br /> Operating cost/hour : $61.31 100 <br /> Ripper op.cosUhour : $1.69 25 <br /> Operator cosUhour : $30.65 NA <br /> Total unit cosUhour : $142.33 Total fleet cosUhour : $142.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,214 LCY factor : NA volume : 1,214 LCY <br /> <br />Source of estimated volume :3.01 acres at 3' depth <br />Soume of estimated swell factor:NA ' <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (ishift/day) <br />Partly consolidated stockpile Spoil pile : 0.70 (ind-m~ <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,700 feet Matedal weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.69 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 968.86 LCY/hr <br /> Adjusted fle <br />e <br />t <br />p <br />r <br />odu <br />c <br />t <br />ion 968.88 LCY/hr <br />C. ~L~ <br />}4 y ~ <br />x <br />'~ <br />^ <br />~~'~h_jx..i# E;"` F <br />~ <br />i <br />Y~R <br />iY <br />¢ ~~ <br />:~~ i~ T <br />~ <br />~a <br />S`~ <br />~1a <br />y <br />~ <br />~ <br />~ <br />" <br />~i~ <br />~"y <br />~y~'~.' <br />'~l~ <br />~S~ <br />. <br />; <br />~ <br />x <br />~ <br />'x~'?ht't ~3idk c~ r <br />*i3 <br />i~~ <br />~ <br />. <br />rc <br />.] <br />-r Y <br />. r.- <br />.. c..h + <br />. xv <br />iH-. <br />.. <br />.. 4': <br />~ <br />s <br />.. <br />.t v. <br />, s. <br />i 3 <br />li .a <br />. <br />, <br />xJ <br />2'S <br />. <br />. . <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total jab time : 1.25 Hours <br />Unit cost : $0.147 /LCY Total job cost : $178 ~; <br />State :Colorado <br />County :Mesa <br />Site :32 Road Pit <br />
The URL can be used to link to this page
Your browser does not support the video tag.