Laserfiche WebLink
Agency or organization name :OMG <br />Taskp: 001 8 State :Colo2do <br />Date: 07/29/2002 Counry:Mesa <br />User: GflM Site :32 ROad Pif <br />PermiVjob q : M-1985.219 <br />Abbreviation :none <br />Fllename:M219-001 '.. <br />Permit or other job action :Final Reclamation Cost Estimate (orArea 'A' <br />Task descnption :Place overburden on 3.67 acres of Si <br />Model : Cat 833E Series 2 <br />Cost Breakdown ~ Job utilization % <br />Ownership cosUhour: $7262 NA <br />Operating wsl/hour: $170.00 100 <br />Operetor cosUhour: $30.84 NA <br />Total unit cosuhour: $273.46 Total fleet wst/hour. <br />Initial Swell <br />volume: 2,966 LCY factor: <br />Spume of quantity takeoH:3.5 <br />Source of estimated swell factor : NA <br />iaulirw CaoadN: <br />Scraper Payload (weight) Basis <br />Matedal weight: 2,550 pounds) <br />Matedal descdption <br />Earth - Drypacked <br />Ratetl payload: 82,000 pountls <br />Payload capadry: 3276 LCV <br />Shift basis: fper day <br />Horsepower : 490 <br />Weigh (UST) : 56.34 <br />Cost data spume : lCRG1 <br />Loose <br />NA volume: 2,966 LCY <br />BovA (volume) Basis <br />Stmck volume <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />34.00 LCV <br />26.60 LCY <br />28.60 LCY'^ <br />~tle Time Qoad+haul+sorea d+retuml~ Loading time: 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />TraVBI time : ' tootling time per pair an push-pull models <br />Route ~ Distance (feet) ~ Grade (%) Roll. res.(%) ~ Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 800 8.5 5.0 13.5 363 229 minutes " <br />Return : 800 -8.5 5.0 -3.5 2,740 0.53 minutes " <br />"navel time adjusted for ecceleratlon and deceleration at load antl dump ptints <br />Joh Condition Corremion Factors <br />Site altitude (feet} : 4, 70( <br />Altitude adjustment factor : 1.00 <br />Job efficiency factor : 0.83 <br />Net job correction factor : 0.83 <br />JOB TIME AND COST <br />Fleef size: 2 Scraper(s) <br />Total cycle time : 4.42 minutes <br />flS)justed Houdv Production <br />Unatljusted unit production : 387.95 LCY/Hour"' <br />Adjusted unit production : 322.00 LCY/Hour <br />Adjusted fleet production : 644.00 LCV/Hour <br />~. times vdume on ouch-Dull models <br />Total job time : 4.61 Hours <br />Unit cost: $0.663 /LCY Totaljob cost: $1,966 <br />rr~t~.,, i~A. ~a smr.~., },~,s ~t'~, ~* `?~s?3i`{~v` "* ~ ra `§C.3~+z545 V t:} s/4 ~reFe p j~`' it` S~, !~ <br />_, ...~+~i..°. J-~q ..,k;?*ra,v ,. ..,.a bs. ..,. ~, ti.j~w was. ,.a , <br />