Laserfiche WebLink
JRN-23-02 05:42 PM VfiRRFI COMPANIES <br />Pege ]rx) <br />Construction Materials Rule 4 <br />970 353 4047 <br />types of communication to the Board or OlTice a Reclamation Rcpnrt and <br />request fur reclamation responsibility release stating that reclamation is finished. <br />(2) Such rcpart shall contain, at a minimum: <br />(a) the name and mailing address of the cun~cnt Owner of <br />record of the affected land: <br />(b) a signed statement by the Person conducting exploration <br />that all reclamation requirements of the Exploration Notice have been <br />satisl`ted; <br />(c) a narrative describntg site grading, topsoil replacement, <br />successful revcgekttion and other stabilization activities, as approptuue; <br />(d) suitable pho[ograplts of the reclaimed area; and <br />(e) a map of sufficient derail to determine thu location of the <br />exploration activity. <br />tt3(s) (3) The Ofice shall, within ninety (90) calendar days after receiving <br />said report, or as soon nc~rcafrer a5 weather conditions pctntit, inspect the lands <br />and reclamation described ut the notice to determine iJ' lhc. Operator has <br />complied with all applicable requu"entt:nts. <br />113($) (4) if the Office finds the reclamaiion to be nt compliance with the <br />requirements of the Notice of Intent, Rules and Regulations, and the Act, [he <br />Utiice shall release all applicable petforntancc and lnancial warranties. The <br />financial warranty shall not be held for more than sixty (6U) Calendar days after <br />the Office fords that the Notice of Intent Operator has successfully completed <br />reclamation. However, an appeal W the release of the financial and <br />pcrfurntnncc shall stay the release on the sixl.ieth (60) day pcndinb a Formal <br />Board Hearhtg. <br />4.1(r RELEASE OF FrRFORMANCE ANll FINANCIAL WARRANTIES <br />FOR NIINING UYERATIONti <br />P. 08 <br />4.16.1 Opcrnlor Rcquirrntcnts <br />