My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-02_REVISION - M1984101
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984101
>
2007-02-02_REVISION - M1984101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 10:04:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
Revision
Doc Date
2/2/2007
Doc Name
Bond calculation related to inspection
From
DRMS
To
Chaparral Meadows Pit
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 00{s <br />Date : 02/02/2007 <br />User: KAP <br />CIRCES Cost Estimatinu Software <br />TRUCK/LOADER TEAM WORK <br />zation name :Colorado Division Of Reclamation, Mining, And Safety <br />Sta[e ~: Colorado Permit/job#:M-1984-101 <br />_ County :Park Abbreviation :none <br />Site :Chaparral Meadows Filename :M101-007 <br />Permit or other job action :Bond Calculation Related to <br />Task description : Loadout Tires <br />HOURLY EQUIPMENT COST <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />sheet 1 of 2 <br />Shift basis : 1 per day <br />Truck/loader team -Truck :Generic 15-18 cy 6x4 <br />-Loader :CAT 950G high lift (2002) <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area - Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename : truck2 loader NA NA NA NA <br />`Yo Utilization-machine: 100 9 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership costlhour: $18.41 821.50 NA NA NA NA <br />Operating cosUhour: $49.85 $2.51 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cosUhour: $21.75 $32.78 NA NA. NA NA <br />Unit subtotals : $90.01 $56.79 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : - Work : $416.83 Support: $0.00 Maintenance : $0.00 <br />Total work team cosllhour : $416.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 300 CCV factor : 1.500 volume : 450 LCY <br />Material weight : 200 poundslLCY Struck volume <br />Descr.: USER-PROVIDED WE/GNT DATA Heaped volume <br />Rated payload : 63,980 pounds Average volume <br />Payloatl capacity : 319.90 LCY Adjusted volume": <br /> Final truck volume based on number of loader passes <br /> 'truck volume atllusted to not exceetl ratetl payload or heaped volume <br />15.00 LCY <br />78.00 LCY <br />16.50 LCY <br />18.00 LCY <br />16.88 LCY <br />Loatlin9 Tool Capaci[v : Uob Condition Corrections : Site altitude (ftJ : 8,740 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 0.970 1.000 (Cat HO <br />Bucket fll factor: 0.750 Job efficiency: 0.830 0.830 (l shifUda <br />Adjusted bucket capacity : 2.812 LCY Net correction : 0.805 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.