My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-02_REVISION - M1984101
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984101
>
2007-02-02_REVISION - M1984101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 10:04:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
Revision
Doc Date
2/2/2007
Doc Name
Bond calculation related to inspection
From
DRMS
To
Chaparral Meadows Pit
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 02/02/2007 <br />User : ICAP <br />State :Colorado Permit/job # :M-1984-101 <br />County :Park Abbreviation :none <br />Site :Chaparral Meadows Filename :M101-003 <br />Agency or organization name :Colorado Division Of Reclamation, Mining, And Safety <br />Permit or other job action :Bond Calculation Related to Inspection <br />Task description :Rip Compacted Areas <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosf/hour : $58.24 NA <br />Dozer operating cost/hour : $73.75 100 <br />Ripper operating cosUhour : $6.85 ~ 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $171.63 Total fleet cosUhour : $171.63 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 7.50 acres Rip depth (ft) : 1.00 <br />Bank volume <br />Volume <br />NA BCY <br />12,100 BCY or CCY <br />Source of estimated quantity :Reclamation Plan and Inppection <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area.: Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />JOB TIME AND COST <br />1.00 feeUpass <br />7.08 feeUpass <br />250.00 feeUpass <br />88.00 feeUminute <br />0.25 minutes/pass <br />0.789 acres/hour <br />1,272.55 cu. yds./hour <br />Unadjusted production <br />per selected method : 1,272.55 cu. yds./hour <br />Site altitude : 8,740 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 1,056.22 cu. yds./hour <br />Adjusted fleet production : 1,056.22 cu. yds./hour <br />Fleet size : 1 dozers) Total job time : 11.46 hours <br />Unit cost : $0.162 per cu. yd. Total job cost : $1,966 <br />
The URL can be used to link to this page
Your browser does not support the video tag.